Choose country for shipment delivery

Tama WBS52RZS-MPB Starclassic Walnut/Birch Lacquer Molten Platinum Burst Drumkit

Product code: 1220490

Tama WBS52RZS-MPB Starclassic Walnut/Birch Lacquer Molten Platinum Burst Drumkit

Product code: 1220490

Discover a truly dynamic and articulate sound with this stunning shell pack, the result of the latest evolution in the celebrated Starclassic series. By blending the rich, warm low-to-mid tones of walnut with the sharp, clear attack of birch, this kit offers a uniquely versatile and expressive voice suitable for any musical genre, from the studio…
  • Series: Starclassic
  • Shell Material: Birch, Black Walnut
  • Number of Plies: 6
  • Number of Bass Drum Plies: 7

Tama WBS52RZS-MPB Starclassic Walnut/Birch Lacquer Molten Platinum Burst Drumkit

Discover a truly dynamic and articulate sound with this stunning shell pack, the result of the latest evolution in the celebrated Starclassic series. By blending the rich, warm low-to-mid tones of walnut with the sharp, clear attack of birch, this kit offers a uniquely versatile and expressive voice suitable for any musical genre, from the studio to the stage.

The core of this set is its hybrid shell construction, which delivers a beautifully balanced sound that is both powerful and nuanced. This sonic excellence is enhanced by premium features designed for the discerning drummer. The die-cast hoops not only make tuning easier and more consistent but also provide a crisper attack, clear and resonant highs, and incredibly powerful rim shots. The innovative Star-Cast Mounting System ensures that your toms resonate freely with maximum stability, allowing their true tone to shine through without interference.

Finished in a breathtaking Molten Platinum Burst lacquer, this kit looks every bit as good as it sounds. The finish highlights the beautiful wood grain and adds a touch of pure class to your setup. The kit comes equipped with high-quality Evans G2 batter heads and Tama Power Craft resonant heads, so you're ready for a top-tier playing experience right out of the box. This configuration provides a powerful foundation for any setup, featuring two rack toms and two floor toms for a wide tonal range.

Please note: This is a shell pack only. Snare drum, cymbals, and hardware are not included.

  • Shells: 6mm, 4ply Birch + 2 inner ply Walnut (Tom Tom, Floor Tom) / 7mm, 5ply Birch + 2 inner ply Walnut (Bass Drum)
  • Hoops: Die-Cast Hoops for consistent tuning and powerful attack
  • Mounting System: Star-Cast for maximum resonance and stability
  • Heads: Evans G2 2-ply clear batter heads and Tama Power Craft 2 resonant heads
  • Finish: Molten Platinum Burst Lacquer
  • Configuration: 22"x16" BD, 10"x7" TT, 12"x8" TT, 14"x12" FT, 16"x14" FT
  • Included Hardware: 2x MC69 Single Tom Attachments
Series

Series: Starclassic

The Starclassic series is renowned for its premium craftsmanship and professional sound. Available in various shell materials like maple, walnut/birch, or bubinga, it delivers rich tone, powerful projection, and excellent dynamic response - ideal for studio and stage alike.

Shell Material

Shell Material

  • Black Walnut
  • Birch
Number of Plies

Number of Plies: 6

The number of layers affects the overall resonance, sustain, and tonal qualities of the drums. With 6 layers, the sound becomes fuller, offering strong low-end presence and clear midrange frequencies, while maintaining more controlled and less pronounced high frequencies.

Number of Bass Drum Plies

Number of Bass Drum Plies: 7

A 7-ply bass drum delivers a deep, focused low end with strong punch and controlled sustain, ensuring solid presence and power without excessive overtones.

Properties

Series

Starclassic

Colour

Black, Grey

Number of Plies

6

Number of Bass Drum Plies

7

Original Colour by Producer

Molten Platinum Burst

Material

Shell Material

Birch, Black Walnut

Package

Incl. Cymbals

No

Incl. Hardware

No

Incl. Drumsticks

None

Package Contents

Tom Holder

Dimensions and Weight

Bass Drum Dimensions

22x16"

Tom 1 Dimensions

10x7"

Tom 2 Dimensions

12x8"

Floor Tom 1 Dimensions

14x12"

Floor Tom 2 Dimensions

16x14"

Country

Made in

China

Documents

Manufacturer information
Responsible person:
OLAND MEINL MUSIKINSTRUMENTE GMBH & CO. KG
Musik-Meinl-Str.1, 91468, Gutenstetten, Germany
Manufacturer:
OLAND MEINL MUSIKINSTRUMENTE GMBH & CO. KG
Musik-Meinl-Str.1, 91468, Gutenstetten, Germany
Safety instructions

Please refer to the user manual for the specific safety instructions for this product.